Laserfiche WebLink
<br /> <br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 https://drms.colorado.gov/ <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Virginia Brannon, Director <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />August 25, 2022 <br /> <br /> <br />Mark Gray <br />New Elk Coal Company, LLC <br />12250 Highway 12 <br />Weston, CO 81091 <br /> <br /> <br />Re: New Elk Mine (Permit No. C-1981-012) <br /> Proposed Decision - Technical Revision No. 76 (TR-76) <br /> Proposed new haul road. <br /> <br /> <br />Dear Mr. Gray: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision for <br />Technical Revision No. 76 at the New Elk Mine. Notice of the proposed decision will be published in <br />the The Chronicle - News as soon as possible. The day following the first publication will initiate the <br />ten (10) day public comment period for the Division's decision. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount <br />of Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, <br />if the Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing <br />bond that equals or exceeds the Revised Liability. This Technical Revision must not be implemented <br />until this proposed decision becomes final and until any required increase in bond is submitted to and <br />approved by the Division. <br /> <br />If there are stipulations attached, please sign and return the proposed decision form to the Division. <br /> <br />If you have any questions, please contact me. <br />