Laserfiche WebLink
Trapper MineDATE: 11/19/2019 <br />DESIGNED BY: BDN, RDH <br />DRAWN BY: BDN <br />L: \ Engineer \ Permits \ TR-130 \ Maps \ M10A_TR130.dwg <br />N <br />400 0 400 800 1200 <br />1 2 3 <br />SCALE: 1" = 400' <br />N 402000 <br />N 404000 <br />N 406000 <br />N 408000 <br />N 410000 <br />N 412000 <br />N 400000 E 1436000E 1438000E 1440000E 1442000E 1444000E 1446000E 1436000E 1438000E 1440000E 1442000E 1444000E 1446000N 402000 <br />N 404000 <br />N 406000 <br />N 408000 <br />N 410000 <br />N 412000 <br />N 400000 <br />N 398000N 398000 <br />N 414000 N 414000 <br />Note: Production may fluctuate according to economic, <br />geologic, or other conditions. Limits are shown for <br />maximum possible production from 2018 through 2022. <br />Operations may actually progress slower than depicted <br />on these maps. Backfilling, grading, and topsoil <br />laydown will follow mining operations in a timely <br />manner. <br />CONTOUR INTERVAL : 10' <br />SCALE : 1"=400' <br />HIGHWALL <br />MINING AREA <br />(EXISTING) <br />PR-9 11/19/19 RDH/BDN 5 YEAR MINING/RECLAMATION PLAN UPDATE <br />Topographic information compiled from aerial photography dated 11/2019. <br />2020 <br />2021 <br />2022 <br />2019 <br />2018 <br />PR-9 04/25/20 RDH/BDN 5 YEAR MINING/RECLAMATION PLAN UPDATE2022 <br />TR-130 3/30/22 PIT LIMIT UPDATE I-PIT <br />2020 <br />20202021 <br />2022 <br />2020 <br />TR-128 8/23/21 PIT LIMIT UPDATE, COYOTE AS-BUILT AND TEXT UPDATES