My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-05-26_REVISION - M2011004 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011004
>
2022-05-26_REVISION - M2011004 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2022 2:56:16 PM
Creation date
5/26/2022 1:26:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011004
IBM Index Class Name
Revision
Doc Date
5/26/2022
Doc Name Note
Cover Letter
Doc Name
Adequacy Review Response
From
Krauth Co Inc
To
DRMS
Type & Sequence
AM2
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rE--1A I I <br /> May 25, 2022 <br /> Tim Cazier <br /> DRMS <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> RE: P-2011-004 J&J Stone Pit#1 AM-02 <br /> Response to Preliminary Adequacy Review <br /> Dear Mr. Cazier, <br /> Please accept this correspondence as additional information and clarification for the above reference <br /> review. <br /> APPLICATION <br /> 1. Page 2 of the application is revised to reflect the center of mining in Section 2. <br /> 2. Page 2 of the application is revised regarding mine entrance coordinates. <br /> EXHIBIT A Legal Description <br /> 3. The legal description is revised for consistent mine entrance coordinates. The second Exhibit A was <br /> the legal description that is now included on the first Exhibit A. <br /> EXHIBIT C Mining Plan Map <br /> 4. The acreage is revised to 7.36. <br /> EXHIBIT D Mining Plan <br /> 5. The applicant commits to constructing/maintaining the armored channel that will convey surface flow <br /> during storm events to the infiltration pond. <br /> EXHIBIT F Reclamation Plan <br /> 6. Topsoil stockpiles will be seeded with to stabilize against erosion. The third paragraph is revised <br /> accordingly. <br /> 7. Approximately 10 acres will be topsoiled during reclamation. The third paragraph is revised <br /> accordingly. <br /> 8. The Fremont County Weed Control Plan is provided herein. <br /> Environmental Alternatives,Inc. P.O. Box 326, Canon City, CO 81212 Phone:719-275-8951 <br /> Email:angela@envalternatives.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.