My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-11-03_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2021-11-03_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2021 4:20:02 PM
Creation date
11/3/2021 4:18:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
11/3/2021
Doc Name
Incompleteness Letter
From
DRMS
To
New Elk Coal Company, LLC
Type & Sequence
TR76
Email Name
JLE
JLE
Media Type
D
Archive
No
Supplemental fields
Permit Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://drms.colorado.gov <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Virginia Brannon, Director <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />November 3, 2021 <br /> <br />Larry Cook <br />New Elk Coal Company, LLC <br />12250 Highway 12 <br />Weston, CO 81091 <br /> <br /> <br />Re: New Elk Mine (Permit No. C-1981-012) <br /> Technical Revision No. 76 (TR-76) <br /> Change a light use road to a haul road. <br /> <br /> <br />Dear Mr. Cook: <br /> <br />We have received your application for a technical revision to your permit to conduct coal mining in <br />Colorado. Our initial review indicates that all preliminary items required by Rule 2.08.4(5) have <br />not been submitted. Thus, your application is incomplete for the purposes of filing as of November <br />3, 2021. <br /> <br />With TR-76, New Elk Coal Company, LLC (NECC) is proposing a new haul road. However, the <br />extent of the haul road proposed with the submission does not include the full length of the road <br />NECC is upgrading/constructing. Based on the October 13, 2021 site inspection and further <br />discussion with NECC staff, the haul road will extend east outside of the current disturbance and <br />permit boundary and connect to an established road. NECC will need to revise the Technical <br />Revision to address the full length of the road to where it connects to an established public road. <br /> <br />Application Form <br /> <br />The application form does not indicate there is a change in disturbed, permit, or affected area. This <br />does not appear to be accurate given the extent and length of the haul road. Please revise this as <br />necessary. <br /> <br />Update Section 2.04 <br /> <br />Please submit the minimum requirements for information on environmental resources required by <br />Rule 2.04 for any new proposed disturbed and affected area associated with the haul road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.