My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-07_REVISION - M2012032 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-09-07_REVISION - M2012032 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 6:51:57 AM
Creation date
9/8/2021 6:43:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
9/7/2021
Doc Name
Adequacy Review Response #3
From
Ouray Silver Mines Inc.
To
DRMS
Type & Sequence
TR12
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ouray Silver Mines, Inc. <br /> 1900 Main St.Unit 1 <br /> PO Box 564 <br /> Ouray, CO 81427 <br /> ODRAY" �l X h.�E_ <br /> To: Colorado Division of Reclamation, Mining& Safetyftl <br /> 1313 Sherman Street, Rm 215 <br /> Denver, CO 80203 SEP 0 7?0? <br /> From: Todd Jesse, Environmental Specialist DMSIpN <br /> Date: September 1, 2021 IN,,NN,,++ <br /> Subject: Adequacy Review-3; Revenue Mine,Technical Revision No. 12 to DRMS 1 N <br /> Mining Permit#M2012-032 <br /> Dear Mr. West <br /> Ouray Silver Mines Inc. (OSMI) received Adequacy Review -3 for Technical Revision 12 to Permit <br /> M2012-032 for the Revenue-Virginius Mine(Mine). The Adequacy Review raised 2 major points, each <br /> of which are addressed in italics under headings that repeat the DRMS point of clarification. <br /> l. Your response, including the supporting regulatory information for the proposed abandonment of <br /> GW-4 is noted and accepted. However, no discussion of the plugging and abandonment method <br /> of GW-4 was included.'Please provide details of the chosen method of plugging and <br /> abandonment of GW-4, in accordance with Rule 5.4, including a tentative schedule of when that <br /> activity will take place. <br /> Response: The area around the well will be dug down I foot and the well casing will be cut there. The <br /> well will be filled with bentonite and the top 3 feet of the well will be plugged with concrete. The ]-foot <br /> hole will be filled with 3-inch rock to match groundcover in the area around the well. The well will be <br /> abandoned in late September or early October once the Division approves TR12. OSMI surface crews <br /> will perform the work. <br /> 2. The proposal of visual leak detection of Pond 3 is also noted and accepted,please provide a <br /> commitment to monthly visual monitoring for leak detection of the outslope of Pond. Reporting <br /> documentation will be provided with the quarterly Groundwater Monitoring Report. <br /> Response: The mine commits to monthly visual monitoring for leak detection along the outslope of Pond <br /> #3. A form has been created in Fulcrum (a fellable form application) and monitoring will begin <br /> immediately. The monthly inspections will be compiled and sent to the DRMS with the quarterly <br /> Groundwater Monitoring Report. <br /> Please do not hesitate to call me with concerns or questions at 970-325-9830. <br /> Regards, <br /> .r <br /> Todd Jesse <br /> Environmental Specialist <br /> Phone: (970) 325-9830 ♦ Fax: (970) 325-9824 <br />
The URL can be used to link to this page
Your browser does not support the video tag.