My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-31_PERMIT FILE - M2019041
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019041
>
2021-08-31_PERMIT FILE - M2019041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 1:52:20 PM
Creation date
8/31/2021 10:02:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019041
IBM Index Class Name
Permit File
Doc Date
8/31/2021
Doc Name
Consent Agenda Summary Form
From
DRMS
To
SEMA Construction
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
© COLORADO <br /> Division of Reclamation, <br /> Mining and Safety <br /> Department of Natural Resources <br /> RECEIVED <br /> August 23,2021 <br /> Auc 312021 <br /> Gavin Madsen DIVISION OF RECLAMATION <br /> SEMA Construction, Inc. MINING AND SAFETY <br /> 7353 S Eagle St <br /> Centennial, CO 80112 <br /> Re: SEMA Construction,Inc,Motorcross Borrow Pit,File No.M-2019-041, <br /> Consent Agenda Summary Form <br /> Mr.Madsen: <br /> A possible violation hearing is scheduled for consideration by the Mined Land Reclamation Board <br /> (Board). As indicated in the Division's correspondence dated August 12, 2021,Re:Reason to Believe a <br /> Violation Exists and Notice of Enforcement Hearing,the formal Board hearing is scheduled to occur <br /> during the September 22-23,2021 meeting. <br /> Please find enclosed the Staff Summary Form for Consent Agenda Items(consent form)for the possible <br /> violation at the site. If you concede to the violation, corrective actions and civil penalties, please affix <br /> your notarized signature on the enclosed consent form and return the signed form, with original <br /> signatures,to the Division no later tha n September 10, 2021. Upon receipt of the signed and notarized <br /> consent form the item will be moved from the Boa rd's agenda for enforcement hearings to consent <br /> items and there will not be a formal Board hearing regarding the possible violation. <br /> However,if you wish to contest the possible violation or any of the conditions of the enclosed consent <br /> form, please inform the Division at your earliest convenience and do not sign the consent form. In the <br /> absence of a signed and notarized consent form, the formal Board hearing will proceed as scheduled for <br /> September 22-23,2021. <br /> If you have any questions, please contact meat peter.hays@state.co.usor(303) 866-3567 Ext.8124. <br /> Sincerely, <br /> ieterS. Hays <br /> Environmental Protection Specialist <br /> Enclosure -Staff Summary Form for the Consent Agenda Items <br /> Ec: Jared Ebert;Division of Reclamation,Mining&Safety <br /> f4 ` )01 <br /> 1313 Sherman Street,Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 https://drms.colorado.gov <br /> Jared S.Polis, Governor I Dan Gibbs,Executive Director Virginia Brannon,Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.