My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-07-29_INSPECTION - M2001022
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2001022
>
2021-07-29_INSPECTION - M2001022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 5:51:27 AM
Creation date
8/2/2021 5:47:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001022
IBM Index Class Name
Inspection
Doc Date
7/29/2021
Doc Name
Corrective Action Documentation
From
Loveland Ready-Mix
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AC <br /> LOVELAND PEcF-IVFD <br /> READY-MIX July 28, 2021 jUL z w zuzi <br /> CONCRETE DIVISION OF RECLAMATION <br /> MINING&SAFETY <br /> Mr. Peter Hays <br /> PO BOX 299 Colorado Division of Reclamation, Mining and Safety <br /> LOVELAND, CO 80539 Department of Natural Resources <br /> 1313 Sherman Street, Room 215 <br /> OFFICE 970.667.2680 Denver, CO 80203 <br /> FAX 970.667.0092 <br /> RE: Green/Croissant Sand and Gravel Mine M2001-022 <br /> May 28, 2021 Inspection Report—Corrective Action <br /> Dear Mr. Hays, <br /> We are writing to provide the Corrective Action information identified by Jerod Ebert <br /> in his May 28, 2021 Inspection Report. <br /> In order to document that all Cell 4 slopes both above and below the water surface <br /> were backfilled and graded to the required 3:1V ratio LRM hired PLS Corporation to <br /> survey Cell 4 both above and below the water surface. This topographic survey is <br /> the most comprehensive and accurate survey available, and has been stamped and <br /> signed by a professional land surveyor. <br /> The survey points from this survey were provided to Walt Niccoli of Telesto Solutions <br /> for analysis of the 3:1 slope requirements. Mr. Niccoli was asked to review the <br /> slopes both above and below the surface water to determine compliance with the <br /> reclamation plan and to review and compare actual ground measurements and <br /> slopes against the exhibits prepared by King Surveyors. The Reclamation Slope <br /> Evaluation Report prepared by Telesto Solutions,July 28, 2021, is included with this <br /> letter. <br /> If you have any questions or require additional information, please advise. <br /> Sincerely, <br /> Stephanie Fan er-English <br /> Loveland Ready Mix Concrete, Inc. <br /> Attachment: Telesto Solutions, Reclamation Slope Evaluation Report,July 28, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.