Laserfiche WebLink
COLORADO <br /> Division of Reclamation. <br /> " Mining and Safety <br /> Department of Natural Resources <br /> MINERALS PROGRAM INSPECTION REPORT <br /> PHONE: (303) 866-3567 <br /> The Division of Reclamation,Mining and Safety has conducted an inspection of the mining operation <br /> noted below. This report documents observations concerning compliance with the terms of the permit <br /> and applicable rules and regulations of the Mined Land Reclamation Board. <br /> MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br /> Lone Tree Pit M-2010-047 Clay,gravel, sand Weld <br /> INSPECTION TYPE: INSPECTOR(S): INSP.DATE: INSP.TIME: <br /> Surety-Related/Monitoring Inspection Eric Scott July 15,2021 10:30 <br /> OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br /> C &H Aggregate, LLC Cliff Simpson 112c-Construction Regular Operation <br /> REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br /> Surety Related Complete Bond $50,100.00 <br /> DATE OF COMPLAINT: POST INSP.CONTACTS: JOINT INSP.AGENCY: <br /> NA None None <br /> WEATHER: INSPECTOR'S SIGNATURE: SIGNATURE DATE: <br /> Clear July 16,2021 <br /> The following inspection topics ere ldentif°ied shaving Pro lc s or Possible Violations® OPERATORS <br /> SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br /> WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND EGU .ATI NS. if a <br /> Possible Violation is indicat o when the Mined Land <br /> Reclamation Board will consider ossible enforcement action. <br /> INSPECTION TOPIC: Financial Warranty <br /> PROBLEM/POSSIBLE VIOLATION: Problem:The financial warranty is not adequate to reclaim the site in <br /> accordance with the approved reclamation plan. This is a failure to maintain the proper financial warranty <br /> amount to complete reclamation of the affected lands pursuant to C.R.S. 34-32.5-117(4)(b) of the Act. <br /> CORRECTIVE ACTIONS: The operator shall submit adequate financial warranty, as determined by the Division. <br /> The Division will be sending a separate surety increase notice to the operator regarding the increase of the <br /> financial warranty. The operator will have 60 days from the date on the surety increase notice to post the <br /> additional financial warranty. <br /> CORRECTIVE ACTION DUE DATE: TBD based on Surety Increase Notice to be sent by DRMS <br /> INSPECTION TOPIC: Gen. Compliance With Mine Plan/Reclamation Plan <br /> PROBLEM/POSSIBLE VIOLATION: Problem: The current mining and reclamation plans need to be updated and <br /> clarified pursuant to C.R.S. 34-32.5-112 (1)(c)(VI) and C.R.S. 34-32.5-116 (1). The operator must provide <br /> sufficient information to describe or identify how the operator intends to conduct the operation and final <br /> reclamation. <br /> CORRECTIVE ACTIONS: The operator shall submit a Technical Revision, with the required $216 revision fee, to <br /> update and clarify the current approved mining and reclamation plans plan to reflect existing and proposed <br /> Page 1 of 4 <br />