My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-06_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2021-05-06_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 10:34:13 AM
Creation date
5/12/2021 4:27:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
5/6/2021
Doc Name
Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR126
Email Name
ERR
MAC
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont. Newmont Corporation <br /> Cripple Creek&Victor Gold Mining Company <br /> 100 North 3rd St <br /> CRIr roc%-Krzam o, v i�i arc P.O.Box 191 <br /> Victor,CO 80860 <br /> www.newmont.com <br /> May 6,2021 <br /> ELECTRONIC DELIVERY <br /> Mr. Brock Bowles <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources <br /> Division of Reclamation,Mining and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> RE: Permit No. M-1980-244; Cripple Creek&Victor Gold Mining Company; Cresson Project; <br /> Technical Revision 126—Reclamation Tree Planting Methods and Success Criteria, <br /> Responses to Adequacy Review#1 <br /> Mr. Bowles: <br /> Cripple Creek and Victor Gold Mining Company (CC&V)received the Division of Reclamation, Mining, <br /> and Safety (DRMS) first adequacy review comments on Technical Revision 126 (TR-126) to Permit No. <br /> M-1980-244. CC&V has reviewed the comments issued in the letter dated April 26,2021 from DRMS,and <br /> prepared responses for each comment. The DRMS adequacy review comment (in italics) and the <br /> corresponding response are presented below. <br /> DRMS Comment(italics): <br /> 1. CC&V proposes to plant trees 3-5 seasons after the establishment of a successful grass,forb, <br /> and shrub community (page 2). According to the CSFS Planting Guide (included with the <br /> application), the site should be prepared by cultivating just before tree planting to eliminate <br /> the grasses because grasses take the much-needed moisture away from the newly planted <br /> seedlings. <br /> a. Please clarify why the trees will be planted 3-5 years after the establishment of the <br /> grass plant community. <br /> b. Fabric mulch is highly recommended by CSFS to control grasses around the saplings. <br /> How will the grasses be managed around the tree saplings? <br /> Newmont Response: <br /> Grasses will be established prior to planting to allow for erosion control and wildlife grazing and <br /> general planting area preparation prior to the tree planting season. Grasses will be removed from <br /> the area surrounding tree plantings as part of tree planting activities. <br /> Though fabric mulch is recommended by CSFS,there are other site preparation activities that may <br />
The URL can be used to link to this page
Your browser does not support the video tag.