My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-17_REVISION - M2000082 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000082
>
2021-02-17_REVISION - M2000082 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 9:55:57 AM
Creation date
2/18/2021 7:15:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000082
IBM Index Class Name
REVISION
Doc Date
2/17/2021
Doc Name
Request for Technical Revision
From
Superior Oilfield Services Co., LTD
To
DRMS
Type & Sequence
TR2
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r M2000-082 TR02 FEB 17 2021 <br /> < f c Complied! 0 Violations <br /> COL.OW 7 Minor Infractions ECS/mac/awa [NG AND DIVISION OFREC SJT136 SAFETY <br /> Ftnr <br /> isys 166-3567 <br /> * * <br /> REQUEST FOR TECHNICAL REVISION(TR)COVER SHEET <br /> File No.: M- 2000-082 Site Name:East 8th Street <br /> County Weld— TR# ORMS Use onli <br /> Permittee:Superior Oilfield Services Co., LTD <br /> Operator(If Other than Permittee): <br /> Permittee Representative:Rick Miller <br /> Please provide a brief description of the proposed revision: <br /> To declare that the mining was done with the Ogilvy Ditch left in place thereby creating two <br /> ponds as the final result as per figures D-1 and F-1 of the Reclamation Permit Application. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time,in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request,including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted(mark only one) <br /> 1IOc, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(l,2 or 3) $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.