Laserfiche WebLink
RECEIVED <br /> JaN Bozo <br /> ECEWED , <br /> DIVISION OF RECLAMATION, JAN <br /> January 15,2021 MINING AND SAFETY OIbISIQN <br /> OF RECLgMq;04 <br /> MINING AND SAFM <br /> Mr. Lucas West <br /> Colorado Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver,CO 80203 <br /> Re:San Luis Project Tailing Dam Q4 2020 Inspection Report,Technical Revision No.33, Permit No.M-1988-112 <br /> Dear Mr.West: <br /> Battle Mountain Resources Inc. (BMRI)is pleased to provide the Q4 2020 San Luis Tailing Dam Inspection Report in <br /> accordance with Technical Revision No.33 to BMRI's Reclamation Permit. <br /> The Inspection was conducted by BMRI Site Manager David Carino. <br /> Enclosed with the inspection report are photos of the Tailing Impoundment facilities to include the drop structure <br /> and the under-drain discharge area.Also included are the Q4 2020 Piezometer Inspection results. <br /> R speFtf(ul , <br /> V Y+ tf <br /> VA <br /> Jul o F. Madrid <br /> Sr. upervisor Colorado Legacy Sites <br /> (719)379-0538 <br /> cc:Devon Horntvedt <br /> David Carino <br />