My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-01-05_INSPECTION - M1999062
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1999062
>
2021-01-05_INSPECTION - M1999062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 7:34:30 AM
Creation date
1/6/2021 7:45:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999062
IBM Index Class Name
Inspection
Doc Date
1/5/2021
Doc Name
Notice of Outstanding Corrective Action
From
DRMS
To
Luis M. Vasquez Company
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br /> Division of Reclamation, <br /> Mining and Safety <br /> Department of Natural Resources <br /> January 5,2021 <br /> Abe Vasquez <br /> Luis M. Vasquez Company <br /> P.O. Box 122 <br /> Lyons, CO 80540 <br /> Re: Indio Red No. 1 &2 Quarry,Permit M-1999-062, <br /> Notice of Outstanding Corrective Action <br /> Dear Mr. Vasquez: <br /> The above-mentioned site has a problem that,according to Division records,has not been resolved. The <br /> following problem was to be resolved on or before December 30, 2020. Listed below are descriptions and <br /> corrective actions for the problem. Please resolve the corrective actions and provide evidence of such <br /> resolution on or before February 26,2021. <br /> Please note that if the corrective actions are not properly addressed, and evidence provided to the Division <br /> by the date provided above,the listed problems could be escalated to the level of possible violations and <br /> would then be referred to the Mined Land Reclamation Board for further action. <br /> Problem/Corrective Action Description: <br /> The affected area boundary markers are incorrectly placed. This is a problem for failure to maintain <br /> boundary markers around the affected area as required by Section 3.1.12(2)of the rule. <br /> The operator shall conduct a survey and replace the boundary markers in the correct location(s). The <br /> operator shall provide proof to the Division that this has been done by the corrective action date. <br /> If the problems have already been remedied,please provide evidence of their completion. If you have any <br /> questions,please contact me at(720)601-2276. <br /> Thank you, <br /> Robert D.Zuber,P.E. <br /> Environmental Protection Specialist II <br /> Cc:Michael Cunningham,DRMS <br /> ''0 COO <br /> 1313 Sherman Street, Room 215,Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us *", <br /> Jared S. Polis,Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.