My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-28_REVISION - M2001010
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001010
>
2020-12-28_REVISION - M2001010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 9:05:31 AM
Creation date
12/29/2020 4:00:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001010
IBM Index Class Name
REVISION
Doc Date
12/28/2020
Doc Name
Request for Technical Revision
From
Elbert County
To
DRMS
Type & Sequence
TR5
Email Name
AME
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Complied! 0 Violations <br /> # g' TR05 ND SAFETY <br /> 1 Minor hifraction Am L AMF/mac/awa ECEIV�� <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET DEC 28� � <br /> File No.: M- 200 _0 O Site Name:Allison Pit <br /> Elbert <br /> County TR# (DRW Use only) <br /> Permittee:Elbert County <br /> Operator(If Other than Permittee): <br /> Permittee Representative: Kyrel Zion Or Jason KOhring <br /> Please provide a brief description of the proposed revision: <br /> We would like to haul in 10,000 tons of recycled asphalt millings to be mixed with 30,000 tons of Allison gravel in <br /> the pit. This stockpile will than be used for spreading gravel on the county's dirt roads. We will use erosion <br /> control straw watue around the siocK piles to protect any suFMce waxer. We will not use any of this material for <br /> reclamation of the mine site. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request.. including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(l, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.