Laserfiche WebLink
KILGORE <br /> .� <br /> JL" PEA K <br /> Pape MATEl�IAtS <br /> October 15th, 2020 <br /> Colorado Division of Reclamation, Mining and Safety RECEwED <br /> Attention: Amy Yeldell OCi <br /> 1313 Sherman Street, Room 215 IozO <br /> Denver, CO 80203 DIVISION OF RECLAMATION <br /> RE: Revised C Road Pit- Mining Plan Map <br /> MINING AND SAFETY <br /> Request for Technical Revision Adequacy Review <br /> Dear Amy Yeldell— <br /> Originally the Mining Plan Map was created by D H Surveys Inc. which is no longer in business. We hired Rolland <br /> Engineering to help us present the Mining Plan Map with our Technical Revision request. As noted Phase 2 & 3 <br /> are changing. Phase 2 will have a mined acreage of 40 acres / total disturbance and the estimated date has <br /> changed to 2022 -2034. Phase 3 will have a mined acreage / total disturbance of 12.2 acres and the estimated <br /> time is 2035-2041. Phase 4 is changing to 3.1 acres/total disturbance with an estimated date of 2042+. Rolland <br /> Engineering believes that the original map by D H Survey was in error as it states 4.1 acres. The total disturbance <br /> area has changed to 74 acres which is noted on the updated Mining Plan Map. <br /> Please feel free to contact me with any questions, concerns at(970-712-6634) or <br /> jim.doody@elamconstruction.com. Thank you for your time and consideration of this request. <br /> Kindest Regards, <br /> Jim Doody <br /> Environmental Manager <br /> Kilgore Companies -Colorado Companies <br /> 556 Struthers Avenue—Grand Junction, CO 81501 <br />