Laserfiche WebLink
��w c COMPLIED! i i 0 VIOLATIONS! <br />" COLORADO DIVISION OF RE( <br />* <br />*" 1313 Sherman Street, Room 215, Dense TRO I <br />• ►sz " <br />0 MDOR LNFRACTIONS ACYlthm <br />REQUEST FOR TECHNICAL RE'► LUlIJl, 1 1" L v ■1711LJ1J L <br />File No.: M- Site Name: <br />�016-050 C Road Pit - 0-9A13038 <br />County Mesa TR# 6ORMS Use oral <br />Permittee: Kilgore Companies LLC. dba Elam Construction <br />Operator (If Other than Permittee): <br />Permittee Representative: Jim Doody <br />Please provide a brief description of the proposed revision: <br />Revised MiningPlan Ma Updating changes to Phase 2 and Phase 3. T�C�t <br />P• p 9 9 MINING AND SAFETY <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Tune Required TR Fee Submitted (mark only one) <br />110c, 111, 112 construction ❑ <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) $175 <br />110d, 112d(1, 2 or 3) $1006 ❑ <br />