Laserfiche WebLink
o�.cow <br /> " COLORADO DIVISI(IR LION MINING AND <br /> *� 1313 Sherman Street,1 80203 ph(303)866-3567 4WI�ED <br /> �87 DMC/thm AUO 020 <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEET_ <br /> IVISION OF RECLAMATION <br /> File No.: M_ 1999-058 site Name:The Pride of America Mine MINING&SAFETY <br /> Gunnison 4mb mm* <br /> County_ -- _TR# — — ---(I)R.115 l 'w oidi°) <br /> Permittee: Colorado Stone Quarries <br /> Operator(If Other than Permittee): <br /> Katie Todt, Lewicki and Associates I� <br /> Permittee Representative: _ O <br /> o 3 �D <br /> Please provide a brief description of the proposed revision: _ ______________.______ <br /> Submission of CSQ's Bioremediation Treatment Plan, Groundwater Monitoring Plan, and a O <br /> Surfaee Water Treatment Plan as required by the MLRB OFder dated May 28, 2020 (Viela o <br /> :3 00 <br /> No. MV-2020-006). Cn <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, v < <br /> the Division may require the submittal of a permit amendment to make the required or desired changes I� ° X <br /> C) <br /> to the permit. o <br /> S 0 <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted (mark only one) <br /> 11 Oc, 1 11, 112 construction a <br /> materials, and 112 quarries $216 <br /> 1 12 hard rock(not DMO) $175 ❑ <br /> I I Od, 1 12d(1, 2 or 3) $1006 ❑ <br />