Laserfiche WebLink
, L 0 �R A D.. j <br /> ivi i n,of Reclamation, <br /> IdSafety <br /> Miinffigan <br /> Department of Natwa,],Resoumen <br /> 1313 he rir ire St. Room 215 <br /> Denver, CO 80203 <br /> June 24,2020 <br /> Kelly Hodge <br /> Broken Arrow Investments LLC <br /> 801 8th St., Ste. 130 <br /> Greeley,CO 80631-3903 <br /> Re: Derr Pit,Permit M-2008-017,Technical Revision Approval,Revision TR06 <br /> Mr.Hodge: <br /> On June 24, 2020 the Division of Reclamation,Mining and Safety approved the Technical Revision application submitted <br /> to the Division on June 19,2020,addressing the following: <br /> Revise mining sequence to remove material for slurry wall installation from Phase 6 instead of Phase S. No groundwater <br /> will be exposed. <br /> The terms of the Technical Revision TR06 approved by the Division are hereby incorporated into Permit M-2008-017. All <br /> other conditions and requirements of Permit M-2008-017 remain in full force and effect. <br /> Because the surface disturbance proposed in this revision does not exceed the extent of disturbance that was previously <br /> bonded for,no bond adjustment is required at this time. <br /> If you have any questions,please contact me. <br /> Sincerely, <br /> Eric C. Scott <br /> Environmental Protection Specialist <br /> d,.. P V M14..rb"I <br /> ee <br /> JG, <br /> 1313 he r ma n . Room 215 f inv ire CO 80203 P( )866,,,,,3567 IF( )832,,,,, 10 Ih-L-LI :// t it . v/ trim . <br /> Jaired PoU Governor IDain GiUbs, Executive Director Virginia Brannon, Director � <br /> ' . <br />