My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-19_REVISION - M2008017
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008017
>
2020-06-19_REVISION - M2008017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:03:56 PM
Creation date
6/22/2020 12:06:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008017
IBM Index Class Name
REVISION
Doc Date
6/19/2020
Doc Name Note
`
Doc Name
Request for Technical Revision
From
J&T Consulting
To
DRMS
Type & Sequence
TR6
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> J&T Consulting, Inc. <br /> JUN 1 p �Q2Q <br /> DIVISION OF RECLAMATION <br /> MININGAND SAFETY <br /> June 15, 2020 <br /> TR06 <br /> I RECEIVED <br /> G�c^C'"CD <br /> ECS/mac <br /> Mr. Eric Scott JUN 19 2020 <br /> Environmental Protection Specialist <br /> State of Colorado <br /> Division of Reclamation, Mining, DIVISION OFRECLAhtAT101^J <br /> &Safety MINING AND SAFI <br /> 1313 Sherman Street- Room 215 <br /> Denver, CO 80203 t('a(I mW <br /> RE: Broken Arrow Investments, LLC- Derr Pit- Technical Revision No. 6 Request <br /> File No. M-2008-017 3 3 <br /> 09 N <br /> Dear Mr. Scott, b <br /> Vl � <br /> V <br /> Broken Arrow Investments, LLC requests a revision to their existing permit to address the following <br /> items: <br /> 1. Project Phasing to add Phase 6a: Revision of the existing permit to reflect surface mining for <br /> Phase 6a not exposing groundwater. Phase 6a will be mined prior to Phase 5a. <br /> A detailed description of the revision is below: <br /> P_r_olect Phasing to add Phase 6a: Revision of the existing permit to reflect surface mining for <br /> Phase 6a not exposing groundwater. Phase 6a will be mined prior to Phase 5a. W <br /> The approved permit has a Phase 5a for initial mining not exposing groundwater and has been bonded o lX <br /> for. After reviewing the mine site layout and logistics to mine Phase 5a there is a better way to provide a rn <br /> material from the proposed Phase 6a that is adjacent to existing disturbed area. We are requesting that <br /> this be updated to reflect a Phase 6a for initial mining not exposing groundwater. The area of Phase 6a <br /> is 11.67 acres and there is additional disturbed area between the Phase 6a and the existing disturbed <br /> area that is 1.68 acres (see attached updated mining plan). The total area needed to be bonded for is <br /> 13.35 acres. Since Phase 5a is already being bonded for (13.94 acres which is greater than the 13.35 <br /> for Phase 6a) we would like to swap the order of the phasing and have Phase 6a bonded for first as it <br /> would be mined first. Please refer to the attached revised bonding calculations for Phase 6a. We would <br /> request that current bond not be increased or decreased as it would cover the bond needed for Phase <br /> 6a since the order of mining for Phase 6a and 5a are being swapped. The current amount bonded of <br /> $2,090,100.00 would cover the amount needed for Phases 1-4 and Phase 6a. <br /> Broken Arrow Investments, LLC appreciates your consideration of this revision request and looks <br /> forward to your response. <br /> vl <br /> 305 Denver Avenue-Suite D•Fort Lupton CO 80621 • Ph: 303-857-6222•Fax:303-857-6224 <br />
The URL can be used to link to this page
Your browser does not support the video tag.