Laserfiche WebLink
Op C <br /> 74 <br /> << COLORAE TR04 Jag j D <br /> 8 1313 E � I 95 � <br /> SJ M/th m <br /> N 16 2020 <br /> REQUEST FOR TECHNICAL REVISION R COVER SHEET , yyEC I <br /> 1978-091-UG Golden Wonder Mine OIV 10F <br /> DSAFE7YG�File No.: M- Site Name: <br /> county Hinsdale TR# (DRMS Use onlvZ <br /> Permittee: LKA international, Inc. <br /> Operator(If Other than Permittee): <br /> Permittee Representative: Kye Abraham c s 3 o -• co <br /> 5-c -4 <br /> Please provide a brief description of the proposed revision: <br /> Replacing existing iron ore slag treatment system with a more conventional treatment system. New system y C <br /> involves a partially buried, corrosion resistant, tank that will serve the dual purpose of collecting and treating <br /> minewater. Also adding a lined surface sump on the existing mine pad to collect stormwater which will be also be <br /> pumped into buried tank for treatment prior to discharge. No additions to existing permit area required. <br /> As defined by the Minerals Rules,a Technical Revision(TR)is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. A <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the 3 N <br /> R.�� <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time,in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however,it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials,and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1,2 or 3) $1006 ❑ <br />