My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-05-15_REVISION - M2019055
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2019055
>
2020-05-15_REVISION - M2019055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 1:34:37 PM
Creation date
5/18/2020 1:18:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019055
IBM Index Class Name
REVISION
Doc Date
5/15/2020
Doc Name
Request for Technical Revision
From
Yvette Downing
To
DRMS
Type & Sequence
TR1
Email Name
ERR
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�99 VED <br /> CoLo>F TROI ��G <br /> *�* 1 866-3567 <br /> *IS76* ERR/jdm MAY 15 2020 <br /> REQUEST FOR TECHNICAL REVISION(TR)COVER SHEET DIVISION OF RECLA 4710N <br /> MINING AND SAFETY <br /> File No.: M- Site Name: *Srrall M <br /> County TR# (DRMS Use only) <br /> Permittee: <br /> Operator(If Other than Permittee): <br /> Permittee Representative: <br /> Please provide a brief description of the proposed revision: <br /> � nin <br /> � <br /> o OIV <br /> 3 <br /> CD <br /> O <br /> O <br /> As defined by the Minerals Rules,a Technical Revision(TR) is: "a change in the permit or application aO <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or oCA <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted Cn <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the o <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to m < <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days.If the Division requires additional information to approve ' <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 3 ° O <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the Cn <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> I IOc, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 1IOd, 112d(1,2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.