My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-04-21_REVISION - M2008030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008030
>
2020-04-21_REVISION - M2008030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 1:11:10 PM
Creation date
4/24/2020 6:07:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008030
IBM Index Class Name
Revision
Doc Date
4/21/2020
Doc Name
Request for Technical Revision
From
Sessions Pit
To
DRMS
Type & Sequence
TR1
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V "'00 <br /> U1 � S <br /> � Sessions Pit M-2008-030 <br /> Technical Revision <br /> RECEIVE <br /> APR 212020 <br /> DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br /> The following is a requested technical revision to the mining plan for Sessions Pit: <br /> Gravel pit will be mined in a series of benches with the first bench being an average of 4'-6' removing <br /> the sandy top layer. Bench#2 will bean average of 6'-10' removing the clay overburden. Bench#3 will <br /> be an average of 12'-14' removing the caliche layer. Bench#4 will be an average of 14'-16' removing <br /> the final layer of gravel. The minimum amount of area between high walls will be 20ft and will not <br /> exceed a maximum of 60ft.Total depth of pit is not to exceed SOft. Maximum length of walls will not <br /> exceed 200ft in length. In addition to the 200' boundary an additional 60' is to be added to the required <br /> border to allow for reclamation purposes. We are not anticipating encountering ground water. If so, <br /> the proper backfill of at least 2 feet of cover will be adhered to. <br /> Reclamation of the pit shall be as follows: <br /> Clay overburden removed from bench#2 shall be place on the additional 60'setback area described in <br /> mining plan. Said material is to be pushed down with a dozer. After stockpiled material are pushed <br /> down,material will be removed from the additional 60'set back from perimeter until a 3:1 slope is <br /> achieved. The remaining topsoil will be placed on slope and seeded back to the native grass mixture <br /> mentioned in original permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.