Laserfiche WebLink
Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Attn: Eric Scott <br /> Re: Permit M-1974-086, Ralston Quarry Slide Remediation Weekly Report, 02/24/2020- <br /> 02/28/2020 <br /> Mr. Scott, <br /> Starting on Monday, February 24th, Ames brought another dozer to the site in order to expedite <br /> the work. Grading continued on the slope working from South to North towards the slide area <br /> contouring the hill to the new grades and building a compacted fill at the bottom. This work has <br /> been monitored by Ground Engineering including on-site inspection, running multiple proctors, <br /> and compaction tests. This information will be provided at the end of construction. <br /> The second dozer began work north of the slide area, stripping the lower part of the slope and <br /> preparing it for pipe installation. Ames expects to have a pipe crew onsite beginning the first <br /> week of March. <br /> Ames Construction held their annual safety meeting on Friday, February 28th, and therefore no <br /> work was done on the site. <br /> Thanks, <br /> Stan Opperman <br />