My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-20_REVISION - M1991083
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991083
>
2020-02-20_REVISION - M1991083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:29 PM
Creation date
2/21/2020 10:49:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991083
IBM Index Class Name
Revision
Doc Date
2/20/2020
Doc Name
Approval Document
From
DRMS
To
CCC
Type & Sequence
TR1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C111. <br /> COLORADO <br /> DNR Division <br /> Mining ofand ReclamSafety ation, <br /> Department of Natural Resources <br /> 1313 Sherman St. Room 215 <br /> Denver, CO 80203 <br /> February 20,2020 <br /> Mr.Trent Stafford <br /> Seifert Construction dba Seifert Enterprises,LLC <br /> 198 Range View Loop <br /> Westcliffe,CO 81252 <br /> Re: Ula Pit,Permit M1991-083,Technical Revision Approval,Revision TRO1 <br /> Mr. Stafford: <br /> On February 20, 2020 the Division of Reclamation, Mining and Safety approved the Technical Revision application <br /> submitted to the Division on February 19,2020,addressing the following: <br /> Revision of Mine Plan to incorporate 400' x 10' highwall and on-site stockpiling and processing of recycled <br /> concrete. <br /> The terms of the Technical Revision TRO1 approved by the Division are hereby incorporated into Permit M1991-083. All <br /> other conditions and requirements of Permit M1991-083 remain in full force and effect. <br /> The revised liability amount exceeds the performance bond currently held and is summarized in the included Surety Increase <br /> Revision. Please submit the additional required bond within 60 days of the date of the Surety Increase as required. The <br /> technical revision will not be final until the bond is approved by the Division. <br /> If you have any questions,please contact me. <br /> Sincerely, <br /> Cvie 1143/fr. <br /> Eric C. Scott <br /> Environmental Protection Specialist <br /> (Of•cOCo <br /> 1313 Sherman St. Room 215 Denver, CO 80203 P(303)866-3567 F(303)832-8106 https://colorado.gov/drms ( - 4 ' oh <br /> Jared Polis, Governor Dan Gibbs, Executive Director *Virginia Brannon, Director * ;',�,-i.Vl/*I <br /> * <br />
The URL can be used to link to this page
Your browser does not support the video tag.