My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-02-13_REVISION - M2000041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000041
>
2020-02-13_REVISION - M2000041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 5:20:18 PM
Creation date
2/14/2020 11:45:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
REVISION
Doc Date
2/13/2020
Doc Name
Request for Technical Revision
From
Fremont Paving and Redi Mix, Inc.
To
DRMS
Type & Sequence
TR6
Email Name
JPL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of.cow <br /> 0 <br /> * COLORADO DIVISION T , 6)N, MINING AND SAFETY ck <br /> 1876 1313 Sherman Street,Roorr JPVjle .03 ph(303)866-3567 <br /> ` <br /> REQUEST FOR TECHNICAL REVISION (TR)COVER SHEET FEB 13 20207 <br /> File No.: M- 2000-041 site Name: DIVISION East Pit DIVISIONnFR CLAM 74 <br /> Pueblo MINING AND SAFETY <br /> County TR# (DBMS Use only) <br /> Fremont Paving and Redi Mix, Inc. <br /> Permittee: <br /> s�a�1 m <br /> Operator(If Other than Permittee): <br /> Permittee Representative:`�O d I Schreiber K 3 3 <br /> ova <br /> Please provide a brief description of the proposed revision: <br /> Fremont Paving and Redi Mix, Inc.would like to revise the permit to increase the Phase II mining area east to a b <br /> Nyberg Road for an additional +/-135 acres to be included in Phase 1113. Phase III would be reduced by the y �a <br /> same acreage, leaving -99 acres in Phase 111. Please see attached map for further clarification. <br /> Phase II reclamation would remain the same, as would Phase III. Fremont only seeks the acreage revisions. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the C0 O <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.