Laserfiche WebLink
o� cTR03 <br /> " COLORADO DIVI, iTION, MINING AND SAFETY <br /> * 1313 Sherman Stre� <br /> *,87 + JPVjIe do 80203 ph(303)866-3567 <br /> RECE <br /> gia <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEET FEB 13 2 <br /> File No.: M- 1990-112 Site Name:State Pit DlmsION of Mc <br /> MWM AND <br /> County Pueblo <br /> TR# (DBMS Use only) <br /> Permittee: Fremont Paving and Redi Mix, Inc. >rrSrilgrh <br /> Operator(If Other than Permittee): <br /> Permittee Representative:Jodi Schreiber <br /> C* 0ic <br /> Please provide a brief description of the proposed revision: � !A. <br /> ° _ tC <br /> Fremont Paving and Redi Mix, Inc. would like to increase the disturbed acreage from 200 to <br /> materials from PCAP M2016-009 for processing. N N <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> 0 <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the o <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to o.I50 <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will N <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction materials, and 1 l2 quarries $216 I/ <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 0 <br />