My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-01-29_REVISION - M2017003
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2017003
>
2020-01-29_REVISION - M2017003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 4:58:58 PM
Creation date
1/29/2020 2:01:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017003
IBM Index Class Name
REVISION
Doc Date
1/29/2020
Doc Name
Request for Technical Revision
From
Colorado Calumet Co., Inc.
To
DRMS
Type & Sequence
TR4
Email Name
ERR
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIv, 041TIONg MINING AN <br /> �e�s 1313 Sherman Stre, do 80203 ph(303)866-3567 <br /> ERWdm <br /> .IAAt 7A�nnn <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEEIDIVISION OF RECLAMATION <br /> File No.: M- 2017-003 site Name: Detroit City Mine MINING&SAFETY <br /> County Park TR# (DRMS Use only) 0 3 <br /> Permittee: <br /> Colorado Calumet Co. Inc. j <br /> Operator(If Other than Permittee): o <br /> w <br /> Permittee Representative: Ben L a n g e n f e l d <br /> Please provide a brief description of the proposed revision: <br /> Addressing items from August 2019 site inspection. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application j o h <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or , o <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, I H, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑� <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.