My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-12-27_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2019-12-27_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 11:42:01 AM
Creation date
12/27/2019 11:30:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
12/27/2019
Doc Name
Issuance Letter
From
DRMS
To
New Elk Coal Company, LLC
Type & Sequence
RN7
Email Name
RDZ
MAC
Media Type
D
Archive
No
Supplemental fields
Permit Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://mining.state.co.us <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Virginia Brannon, Director <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />December 27, 2019 <br /> <br />Louis Head <br />New Elk Coal Company, LLC <br />12250 Highway 12 <br />Weston, CO 81091 <br /> <br /> <br />Re: Permit Issuance <br /> Permit Renewal Application No. 7 (RN-7) <br /> New Elk Mine (Permit No. C-1981-012) <br /> <br /> <br />Dear Mr. Head: <br /> <br />The Division of Reclamation, Mining and Safety's Proposed Decision to approve Permit Renewal <br />No. 7 at the New Elk Mine became final on December 19, 2019. Notice of the proposed decision <br />was published in the The Chronicle - News on November 18, 2019, initiating the thirty (30) day <br />public comment period for the Division's decision. No requests for a formal hearing were received <br />during the comment period. <br /> <br />Enclosed you will find two signed Colorado Division of Reclamation, Mining and Safety Mining <br />Permit documents. An authorized representative of New Elk Coal Company, LLC needs to sign both <br />documents and have them notarized. One must be returned to the Division at the above address; the <br />other must be kept on file at the mine office. <br /> <br />Please be aware that issuance of the permit renewal will initiate time frames of any enclosed <br />stipulations to the permit. Stipulations are enclosed in a rider to the permit, if any were imposed upon <br />the permit. All other enclosed commitments are also in effect as of the permit issuance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.