Laserfiche WebLink
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://mining.state.co.us <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Virginia Brannon, Director <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />November 14, 2019 <br /> <br />Louis Head <br />New Elk Coal Company, LLC <br />12250 Highway 12 <br />Weston, CO 81091 <br /> <br /> <br />Re: Proposed Decision <br /> Permit Renewal Application No. 7 (RN-7) <br /> New Elk Mine (Permit No. C-1981-012) <br /> <br /> <br />Dear Mr. Head: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision Package <br />for Permit Renewal No. 7 at the New Elk Mine. Notice of the proposed decision will be published in <br />the The Chronicle - News as soon as possible. The first publication will initiate the thirty (30) day <br />public comment period for the Division's decision. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount <br />of Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, <br />if the Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing <br />bond that equals or exceeds the Revised Liability. The permit will not be issued until the Division <br />has received and approved the bond. <br /> <br />If there are stipulations attached, please sign and return the proposed decision form to the Division. <br />