Laserfiche WebLink
NEWMONT <br /> G O L D CO R P.w Newmont Goldcorp <br /> Cripple Creek&Victor Mine <br /> 100 N 3"Street <br /> PO Box 191 <br /> Victor,CO 80860 <br /> newmontgoldcorp.com <br /> SENT CERTIFIED RETURN RECEIPT REQUESTED RECEIVED <br /> 7018-0360-0001-1957-5922 <br /> OCT 2 2 2019 <br /> October 17, 2019 19 DIVISION <br /> 10 <br /> NOFR <br /> Ecr.A <br /> MINING&SqF �r1QN <br /> Mr. Timothy Cazier, P.E. TR1E1Y <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources T l/mac <br /> Division of Reclamation, Mining and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street, Room 215 c <br /> Denver, Colorado 80203 t N <br /> Re: Permit No. M-1980-244; Cripple Creek & Victor Gold Mining Company; Cresson <br /> Project; TR#119 —Updated Numeric Protection Limits <br /> Dear Mr. Cazier: <br /> Newmont Mining Company's Cripple Creek and Victor Gold Mining Company (CC&V) <br /> hereby submits the following Technical Revision JR) #119 proposing changes to the 89 I� <br /> existing Numeric Protection Limits (NPLs) at CC&V. 0 <br /> Background: <br /> CC&V met with the Colorado Division of Reclamation, Mining and Safety (DRMS) in <br /> August of 2018 and again in August of 20109 to discuss water monitoring and NPLs at <br /> CC&V. It was identified during the meetings that several NPLs at CC&V are currently <br /> established below the Colorado Department of Public Health and Environment's Water <br /> Quality Control Division, Colorado Regulation NO. 41 (Reg. 41) standards. CC&V agreed <br /> to submit a technical revision to establish updated NPLs for these constituents at the Reg. <br /> 41 table value standards. <br /> Numeric Protection Limits: <br /> CC&V currently has 18 approved NPLs for the Cresson Permit. Several NPLs were <br /> established at values below the Reg 41 table value standards. CC&V proposes that NPLs <br /> that are below the most restrictive Reg. 41 table value standard be set to the current Reg. <br /> 41 table value standard. Table 1 below presents the proposed changes to CC&V s NPLs. <br />