My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-21_REVISION - M2002004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002004
>
2019-10-21_REVISION - M2002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:12:48 PM
Creation date
10/22/2019 1:00:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
REVISION
Doc Date
10/21/2019
Doc Name
Request for Technical Revision
From
GCC Rio Grande
To
DRMS
Type & Sequence
TR7
Email Name
JPL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR07 *GCC <br /> Rio Grande <br /> jle <br /> October 18, 2019 RECEIVED <br /> Mr. Patrick Lennberg OCT 21 2019 3.3 <br /> Colorado Division of Reclamation, Mining, and Safety c <br /> Department of Natural Resources DIVISION OF RECLAMATION - <br /> 1313 Sherman Street, Room 215 MINING&SAFETY �. <br /> � O <br /> Denver, CO 80203 4AI—JIa`1 yj J T <br /> Re: Technical Revision to DRMS Permit M-2002-004 <br /> Proposed Revised Sampling and Analysis Plan for Groundwater Monitoring <br /> Dear Mr. Lennberg: <br /> GCC Rio Grande Inc. (GCC) owns and operates the Pueblo cement plant and associated on-site <br /> limestone quarry operations. GCC has prepared the enclosed Technical Revision (TR) o <br /> requesting a revision to the DRMS Permit M-2002-004 to revise the Sampling and Analysis Plan —� <br /> (SAP) for shallow groundwater monitoring at the site. c=I� <br /> W N <br /> Based on increased knowledge of the groundwater system at the site, groundwater monitoring <br /> locations and requirements have evolved since the previous SAP was prepared in 2003. The <br /> proposed revised SAP incorporates changes resulting from Technical Revision No. 3 (TR-03) <br /> approved by the Colorado Division of Reclamation, Mining and Safety (DRMS) in April 2013, and <br /> TR-06 approved by DRMS in July 2017. <br /> With this request, GCC is submitting a TR Cover Sheet and is enclosing remittance in the form of <br /> a check in the amount of$216.00. GCC looks forward to working with DRMS to finalize the SAP <br /> for its Pueblo facility. If you have questions or concerns regarding this submittal, please do not <br /> hesitate to contact me at (719) 647-6861. <br /> Sincerely, <br /> Dia�Fan <br /> Environmental Engineer <br /> Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.