My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-19_REVISION - M2002120 (17)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002120
>
2019-09-19_REVISION - M2002120 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:06:59 PM
Creation date
9/20/2019 8:30:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002120
IBM Index Class Name
REVISION
Doc Date
9/19/2019
Doc Name
Adequacy Review Response #2
From
Civil Resources
To
DRMS
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIVIL RES1PURCES,LL(ENGINEERS & PLANNERS <br /> SEA k `,'';J <br /> September 18, 2019 <br /> DIVISION OF RECLAMATION <br /> Mr. Eric Scott M!1!RC Am'D SAFET`: <br /> Division of Reclamation, Mines, and Safety P" z <br /> 1313 Sherman Street, Room 215 `Y�SWI Q l/ InQ/d 6 In°�`�� <br /> Denver, Colorado 80203 GG7 /�A 6e)W 444 <br /> RE: Adequacy Review 2 for 112 Construction Materials Reclamation Amendment 1 to the Permit, <br /> Bernhardt Gravel Mine, Permit M-2002-120; Response <br /> Dear Mr. Scott: <br /> This letter is being generated to satisfy the preliminary review dated August 21, 2019 for the Bernhardt <br /> Gravel Mine. The italicized items are the current comment and the bold text are the responses: <br /> The Division of Reclamation, Mining, and Safety has completed its second adequacy review of your 112 <br /> construction materials reclamation permit amendment application. The application was called complete for <br /> review on May 3, 2019. All comment and review periods began on May 3, 2019. The decision date for this <br /> application has been extended to September 5,2019. Please be advised that if you are unable to <br /> satisfactorily address any concerns identified in this review before the decision date, it will be your <br /> responsibility to request an extension of the review period. If there are outstanding issues that have <br /> not been adequately addressed prior to the end of the re view period, and no extension has been <br /> requested, the Division may deny this application. In order to allow the Division adequate time to <br /> re view your responses to any adequacy issues,please submit your adequacy responses to the <br /> Division no later than one week prior to the decision date(August 30,2019). <br /> Please note that any changes or additions to the application on file in our office must also be reflected in the <br /> public review copy, which has been placed with the Weld County Clerk and Recorder. This response has <br /> been delivered to Weld County for public review. <br /> The review consisted of comparing the application content with specific requirements of Rule 6.7, 6.2, 6.4 <br /> and 6.5 of the Minerals Rules and Regulations of the Colorado Mined Land Reclamation Board for the <br /> Extraction of Construction Materials. As with most applications, there are items that will require clarification <br /> of the existing information. Any remaining inadequacies are summarized below.• <br /> - All maps will need to show the revised permit/amendment boundary that corresponds to the <br /> existing fence-line on the south side of the amended property, not the parcel boundary as currently <br /> shown. Please also include full size color copies of all final maps included in the application. The <br /> maps and permit boundary have been updated. Full size maps have been include in the <br /> submittal. <br /> Please verify consistency in the mining and reclamation plans with respect to the statement that <br /> the amended parcel will not be mined. The maps have been updated. <br /> Exhibit E-Reclamation Plan will need to include spillway design information(sizing, capacity, etc.) <br /> and construction design information will need to be provided to verify adequacy of the proposed <br /> inlet/outlet structures. Please also verify the text in the reclamation plan that refers to fertilizer and <br /> trees for consistency with the provided adequacy responses. A spillway design memo, table <br /> and a typical spillway design drawing are attached. The text in the reclamation plan has <br /> been updated to be consistent with the plans. <br /> 323 FIFTH STREET• P.O. BOX 680 0 FREDERICK, COLORADO B0530 0 PHONE: 303.833. 1 41 6 • FAX: 303.833.2850 <br />
The URL can be used to link to this page
Your browser does not support the video tag.