Laserfiche WebLink
RECEIVED <br /> SEP 10 20Ig <br /> RPM,Inc. <br /> DIVISION OF RECLAMATION <br /> September 5,2019 <br /> Colorado Division of Reclamation,Mining and Safety <br /> Attn: Mr. Tim Cazier. P.E. <br /> 1313 Sherman St.,Room 215 <br /> Denver,CO 80203 <br /> Re: Response to the DRMS Technical Revision Approval,No. TR-04, Grisenti Farms Gravel Pit, <br /> Permit No. M-2001-005 <br /> Dear Mr. Cazier, <br /> We want to thank the Division of Reclamation,Mining and Safety for their approval of TR-04, <br /> which authorized the installation of the"Wildlife Island"at the southeast comer of the soon to be <br /> completed Grisenti Farms Gravel Pit Pond 2. <br /> In your approval letter dated September 4,2019,and the attached Reclamation Liability Cost <br /> Summary worksheet,you calculated the increase in the reclamation liability to be$12,414.00 to <br /> cover the cost for"wildlife Island"construction and its seeding. <br /> We have recently completed the installation of the"Wildlife Island", (backfill). What remains is <br /> to seed the"Wildlife Island". Seeding of the"Wildlife Island"along with the Pond 2 area, and <br /> the overburden and topsoil stockpile footprints are scheduled to occur on or about the first of <br /> October,of this year. <br /> Based on our phone conversation today,we request that most of the$12,400.00 financial <br /> warranty increase be waived. Instead we are providing the DRMS a cashier's check in the <br /> amount of$300.00 to cover just the cost to seed the"Wildlife Island"since the"Island"has been <br /> constructed. <br /> Based on our phone conversation today,the financial warranty will be increased to$115,300.00. <br /> We want to thankyou for your help in this matter. <br /> Respectfully, <br /> H. Bruce Humphries <br /> Regulatory Permits Management,Inc. <br /> Consultant for Castle Aggregates <br /> RPM,Inc.,25049 E.Alder Dr.,Aurora,CO 80016 Phone:(303)854-7499 Email:hlhumphries2L&comcast.net <br />