My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-28_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-08-28_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:25:45 AM
Creation date
8/28/2019 2:16:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/28/2019
Doc Name
Second Adequacy Review for #s 1 & 2. #3 Response
From
CC&V
To
DRMS
Type & Sequence
TR117
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONT <br /> G O L D CO R P. Newmont Goldcorp <br /> Cripple Creek&Victor Mine <br /> 100 N 3`d Street <br /> PO Box 191 <br /> Victor,CO 80860 <br /> newmontgoldcorp.com <br /> SENT CERTIFIED RETURN RECEIPT REQUESTED RECEIVED <br /> 7018 0360 0001 1957 5304 <br /> August 27, 2019 AUG 2 8 2019 <br /> DNISION OF RECLAMATION <br /> Mr. Timothy Cazier, P.E. MINING AND SAFETY <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources <br /> Division of Reclamation, Mining and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Re: Permit No. M-1980-244; Cripple Creek & Victor Gold Mining Company; Cresson <br /> Project; Technical Revision 117 — Squaw Gulch Valley Leach Facility Phase 2A <br /> Part 1 Record of Construction Report, , Second Adequacy Review for Nos. 1, 2 <br /> and 3 Response <br /> Dear Mr. Cazier: <br /> On August 23, 2019 Newmont Goldcorp Corporation - Cripple Creek and Victor Gold Mining <br /> Company (CC&V) received the Division of Reclamation, Mining and Safety's (DRMS) Second <br /> Adequacy Review of Nos. 1, 2 and 3 of Technical Revision (TR) No.117. Below, DRMS's <br /> comments are noted in italics followed by CC&V's responses in bold. <br /> ADEQUACY REVIEW NO. 1 <br /> Drawings: <br /> 1. Squaw Gulch — 19VLF Phase 2A-1 and 2A-3 Soil Liner Fill Asbuilt, Drawing 3 of 3: The <br /> response is adequate. <br /> 2. Squaw Gulch — 19VLF Phase 2A-1 and 2A-3 High Volume Collection Pipe Asbuilts, <br /> Drawings 2 and 3 of 3: The response is adequate. <br /> 3. Squaw Gulch — 19VLF Phase 2A-1 and 2A-3 High Volume Collection Pipe Asbuilts, <br /> Drawing 3 of 3: The response is adequate. <br /> 4. Squaw Gulch — 19VLF Phase 2A, Part 1 Drain Cover Fill As-Built Isopach. The response <br /> is adequate. <br /> Report & Appendices: <br />
The URL can be used to link to this page
Your browser does not support the video tag.