My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-27_REVISION - M1991081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991081
>
2019-08-27_REVISION - M1991081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 12:17:31 PM
Creation date
8/27/2019 1:16:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991081
IBM Index Class Name
REVISION
Doc Date
8/27/2019
Doc Name
Request for Technical Revision
From
Sam Keeling
To
DRMS
Type & Sequence
TR1
Email Name
JPL
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIV TR01 <br /> �TION, MINING .'.ND SAFETY <br /> •, *" 1313 Sherman Sri do 80203 ph{303)866-3567 RECEIVED <br /> fez <br /> JPLlmac <br /> REQUEST FOR TECffl* yAl, REVISION fTR] COVER SHEET AUG 2 7 n ig <br /> File No.: M- 1991-081 Site Name:Keeling Pit UMONoF RECLAMATIOM <br /> Huerfano <br /> County TR#— __ .. . (DRMS Use nn/t,) <br /> Permittee:Sam Keeling <br /> )perator(If Other than Permittee): y <br /> b <br /> Permittee Representative:Sam Keeling <br /> cc <br /> Please provide a brief description of the proposed revision: <br /> Weed Management Plan and schedule for implementation of the plan at the Keeling Pit <br /> ,As defined by the Minerals Rules_ a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a I R, <br /> the Division may require the submittal of a permit amendment to make the required or desired change-, <br /> to the permit. l `= <br /> Chc request for a TR is not considered "tiled for review"until the appropriate tee is received by the <br /> Division(as listed below by permit t>pe). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division require4 additional information to approve a <br /> 3 R. you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time_ in writing_ to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the"I R request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision b,, Permit Type- Please mark the correct fee and submit it with <br /> )our request for a Technical Revision. <br /> Permit Tv_L Required TR Fee Submitted(mark only one) <br /> 1 I Oc, 11 1. 112 construction ❑ <br /> materials, and I I2 quarries $216 <br /> 112 hard rock(not DMO) $l 75 ❑ <br /> 1 IOd, 112d(l, 2 or a) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.