My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-09_REVISION - M2008078 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2019-08-09_REVISION - M2008078 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 11:34:08 AM
Creation date
8/9/2019 11:41:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
Revision
Doc Date
8/9/2019
Doc Name
Adequacy Review Response
From
Prowers Aggregate Operators, LLC / J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR5
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4M <br /> J&T Consulting, Inc. <br /> RECEIVED <br /> August 5, 2019 <br /> AUG 09 2019 <br /> Ms. Amy Eschberger DIVISION OF RECLAMATION <br /> Environmental Protection Specialist MINING AND SAFETY <br /> State of Colorado <br /> Division of Reclamation, Mining, & Safety <br /> 1313 Sherman Street— Room 215 <br /> Denver, CO 80203 <br /> Re: West Farm Pit, Permit No. M-2008-078, Technical Revision No. 5 (TR-05), Adequacy Review <br /> No. 1 Response <br /> Ms. Eschberger, <br /> We have received the Division's Technical Revision No. 5 Adequacy Review No. 1 comments relating <br /> to Prowers Aggregate Operators, LLC (PAO) permit number M-2008-078. PAO offers the following <br /> responses addressing the Division's comments. <br /> 1) Please provide more details on the proposed conveyor system, including its approximate dimensions, the <br /> type of support pads/footings,and the number of support pads/footings required <br /> The conveyor will be approximately 5 feet wide and have support legs approximately 10 feet apart. The <br /> support legs will rest on 4 in x 4 in x 8 ft long wood ties, which will be placed directly on the ground <br /> surface. See the photo of a similar conveyor below. There will be approximately 3,500 lineal feet of <br /> conveyor running from the west processing area, to the south across CR HH.5, then to the west within <br /> Parcel B of the permit area. Approximately 350 wood ties will be required under the conveyor support <br /> legs. <br /> Two washer screens will be located near the start of the conveyor to wash product before it is placed <br /> on the conveyor. These screens will have 12 ft x 19 ft x 1 ft thick concrete pads under them, placed <br /> directly on the ground surface. <br /> On Parcel B where the conveyor turns to the west, a conveyor head unit will be placed to maintain <br /> tension in the conveyor belt. The head unit will have a 16 ft x 35 ft x 8 in thick concrete pad under it <br /> placed directly on the ground surface. See the attached Overland Head Section drawing. <br /> On Parcel B there will be 5 radial conveyor stackers. At the start of each stacker there will be portable <br /> concrete block to anchor the stackers to. The blocks will be 4 ft x 4f ft x 2 ft thick, placed directly on the <br /> ground surface. <br /> See the attached revised Exhibit C-1 Pre-Mining/Mining Plan Map showing the layout of the conveyor, <br /> culvert, and radial stackers. <br /> VI <br /> 305 Denver Avenue,Suite D•Fort Lupton,CO 80621 •Ph:303-857-6222•Fax: 303-857-6224 <br />
The URL can be used to link to this page
Your browser does not support the video tag.