My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-07-25_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-07-25_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 2:36:07 AM
Creation date
7/29/2019 9:02:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/25/2019
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR117
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONT <br /> Newmont Goldcorp <br /> GOL DCORR Cripple Creek&Victor Mine <br /> 100 North 3"Street <br /> PO Box 191 <br /> Victor,CO 80860 <br /> TR1 17 newmontgoldcorp.com <br /> TC1\mac <br /> Hand-Delivered Hard Copy $ <br /> July 23, 2019 <br /> �p <br /> Mr. Timothy Cazier, P.E. JUL <br /> Environmental Protection Specialist OMBIONOF RECLAMATION <br /> Colorado Department of Natural Resources WM NO BASE <br /> Division of Reclamation, Mining, and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Re: Permit No. M-1980-244; Cripple Creek & Victor Gold Mining Company; Cresson <br /> Project; Technical Revision 117 — Squaw Gulch Valley Leach Facility Phase 2A Part 1 <br /> Record of Construction Report <br /> Dear Mr. Cazier: <br /> Newmont Goldcorp Corporation—Cripple Creek and Victor Gold Mining Company (CC&V) hereby <br /> provides the Division of Reclamation, Mining and Safety (DRMS) Technical Revision (TR) 117; <br /> requesting approval of the Squaw Gulch Valley Leach Facility Phase 2A Partl Record of . <br /> Construction Report. Phase 2A Part 1 consists of VLF2 sub-phases 2A-1 and 2A-3. The report, <br /> completed by Newfields on July 22, 2019 is enclosed as an attachment to this submission. Pending <br /> DRMS approval of the report, leaching of the certified areas of VLF2 Phase 2A will begin <br /> immediately. <br /> In Addition, due to the report size and format, the report is contained in its entirety within the <br /> sharefile location, https://newmontmining.sharefile.com/f/focbefd5-8dc8-4433-808c-a8Ofee9f399a. <br /> This report details work associated with the Cresson Project that was performed under specific <br /> criteria established in Amendment No. 10 of Permit No. M-1980-244, as approved by the Mined <br /> Land Reclamation Board. Construction Quality Assurance and Construction Quality Control services <br /> are documented in the report from April 2019 through July 2019 for Phases 2A Partl of the Squaw <br /> Gulch VLF. <br /> Financial Warranty: <br /> The financial warranty for the construction of VLF2 Phase 2 has been accounted for through <br /> previous permit amendment approvals. <br /> Enclosed, please find a copy of check no. 200042125 in the amount of$1,006.00. The original <br /> check will be certified mailed to the Division. Should you require further information please do <br /> not hesitate to contact Katie Blake at 719-689-4048 or katie.blake(u,newmont.com or me at (719) <br /> 689- 4042 or Justin.Raglin@newmont.com. <br />
The URL can be used to link to this page
Your browser does not support the video tag.