My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-18_HYDROLOGY - M1981185
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1981185
>
2019-06-18_HYDROLOGY - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 6:52:11 AM
Creation date
6/18/2019 1:30:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
HYDROLOGY
Doc Date
6/18/2019
Doc Name
Due Date Extension Request
From
Diamond Hill Farms
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} <br /> Sunrise Mining, LLC RECEIVED <br /> P.O. Box 160 JUN 18 2019 <br /> Arvada, CO 80001 <br /> �M�AND�OF �tION <br /> June 13, 2019 <br /> Lucas West <br /> Environmental Protection Specialist <br /> Colorado Division of Reclamation, Mining & Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Dear Lucas: <br /> As a follow up to our conversation, I am writing to request an extension for the Q1 2019 water <br /> sampling requirements for permit no. M-1981-185 for the May Day Idaho Mine Complex. As <br /> communicated in March, the snow at the site was too great to complete the Q 1 water sampling <br /> by end of March. <br /> The snow has started to melt enough that we believe our consultant, Kelly Haun from SGM, will <br /> be able to access both the lower and upper sites to complete the water sampling. Kelly plans to <br /> visit the site either tomorrow or Monday to assess the situation. The La Plata River is at flood <br /> levels, so I also want her to confirm both the bridge and site are in safe condition. Assuming <br /> everything looks good, Kelly plans to complete the water sampling by June 25`h. As discussed, <br /> the plan is to use this set of samples to satisfy both the Q1 and Q2 2019 requirements. <br /> Sincerely, <br /> a inatsis <br /> Manager of Sunrise Mining, LLC <br /> sglinatsisQdiamondhi I I farm s.com <br /> 308-760-8925 <br />
The URL can be used to link to this page
Your browser does not support the video tag.