Laserfiche WebLink
NEWMON.T <br /> GOLDCORR ' RECEIVED <br /> ',ewmont Goldcorp <br /> JUN 0 3 2019 C,'ppie Creek&V[do, Co!d Mining,Cc mpgny <br /> Ncr"h ' Stiee <br /> G.O.Pox 121 <br /> DNM OF Victor CO 80860 <br /> �� a;, e,% ontccm <br /> SENT CERTIFIED RETURN RECEIPT REQUESTED <br /> 7018 0360 0000 6681 5812 <br /> May 29, 2019 <br /> Mr. Timothy Cazier, P.E. <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources <br /> Division of Reclamation, Mining, and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Re: Permit No. M-1980-244; Cripple Creek & Victor Gold Mining Company ("CC&V"); <br /> Cresson Project; Marc 1, 2019 Inspection Report Corrective Action <br /> Dear Mr. Cazier: <br /> Newmont Goldcorp's Cripple Creek and Victor Gold Mining Company (CC&V) is the owner of <br /> permit M-1980-244 Cresson Project. A routine inspection conducted by the Colorado <br /> Department of Reclamation, Mining, and Safety(DRMS) on March 21, 2019 identified a finding <br /> with DRMS requiring a corrective action to be completed by June 10, 2019. <br /> Problem: <br /> Water in the LDS-6 VLF I leak detection sump has not been removed, nor have water quality <br /> laboratory results been provided to the DRMS characterizing the water. <br /> Corrective Actions: <br /> Provide photographic evidence of removing all water in the LDS-6 sump and water quality <br /> laboratory test results to the DBMS. <br /> Response: <br /> CC&V shares the understanding for the need to monitor the valley leach facility(VLF) Leak <br /> Detection Systems. Specifically, CC&V remains committed to adhering to the monitoring and <br /> notification requirements described within the M-1980-244 Permit documents. Within these <br /> documents, the Cyanide Emergency Response Plan, as part of Volume IV of the approved <br /> Amendment 11 submittal (as well as a number of preceding amendments), outlines the <br /> monitoring responses and notification requirements for the key solution collection features of the <br />