Laserfiche WebLink
DY RECEIVED <br /> CO D �� <br /> CONCRET4 E COMPANY MAY 2 3 2019 <br /> JLE <br /> DMSK)N OF RSCLAMAl10N <br /> May 20, 2019 MINING AND SAFETy <br /> Mr. Jared Ebert 3 <br /> Division of Reclamation, Mining, and Safety D <br /> Colorado Department of Natural Resources a CO <br /> 1313 Sherman Street, Room 215 b <br /> Denver, CO 80203 <br /> Re: Technical Revision 010 Request(DRMS Permit# M-1987-049) Bromley Lakes <br /> Dear Jared: <br /> On behalf of the City of Brighton, RMCC wishes to revise its current Reclamation Plan to include the <br /> construction of a 10' wide concrete pedestrian/bike trail on the west side of the Cell 3 Reservoir and <br /> the west and north side of Cell 2 at Bromley Lakes (see attached map). As the land owner of this part o I--4 <br /> of the property, this is part of the city's long-term plan to develop the site into a regional park for the <br /> public. o <br /> Enclosed with this letter please find the following: <br /> 1. Request for Technical Revision JR) Cover Sheet; <br /> 2. An overview of the requested TR; <br /> 3. Exhibit A—Location of Pathway; <br /> 4. Exhibit B —No Rise Report; <br /> 5. Letter from City of Brighton requesting the trail <br /> 6. A check in the amount of$216.00 to cover the required TR fee <br /> If you have any questions regarding this requested Technical Revision please do not hesitate to call <br /> me at(720) 966-3346. <br /> Thank you, <br /> ac <br /> J Lamanna <br /> General Manager—Aggregates <br /> Ready Mixed Concrete Company Address: 11778 Highway 52,Fort Lupton,Colorado 80621 Office Phone: (303)286-1983 <br />