Laserfiche WebLink
NEW ELK COAL <br /> COMPANY <br /> RECEIVED <br /> FEB 25 2019 <br /> February 21, 2018 DMSION OF RECLAMATION <br /> MINING AND SAFETY <br /> Rob Zuber <br /> Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street Rm. 215 <br /> Denver, Colorado 80203 <br /> RE: New Elk Mine <br /> Permit C-1981-012 <br /> 2018 Annual Hydrology Report <br /> Dear Mr. Zuber: <br /> The New Elk Mine annual Hydrologic Monitoring Requirements are <br /> summarized in Table 27 Hydrologic Monitoring Frequency Requirements <br /> and Table 28 Water Quality Laboratory Analysis attached to this letter <br /> report. New Elk Mine submitted a technical revision (TR-73) for the Water <br /> Monitoring Program on August 31, 2018. The Division approved this <br /> revision on December 13, 2018. <br /> TR-73 changed the monitoring requirements for wells NE-1-10, NE-6-10a, <br /> NE-6-1 Ob, NM-20, NM-21, NM-22, NM-23, and SF-2. Well NE-1-10 <br /> changed monitoring requirements from quarterly to water level being <br /> monitored semi-annually and field measurements and lab analysis monitored <br /> annually. The rest of the wells changed monitoring requirements so the wells <br /> only have to be monitored well the mine is active. <br /> Phone (719)631-6146 <br /> 12250 State Hwy 12 Fax (719)868-0044 <br /> Weston, Colorado 81091 EMAIL nmason@newelcoal com <br />