My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-02_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2019-04-02_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2024 9:36:45 AM
Creation date
4/2/2019 3:00:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
4/2/2019
Doc Name
Adequacy Review
From
DRMS
To
Climax Mine
Type & Sequence
TR29
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br /> Division of Reclamation, <br /> Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver,Colorado 80203 <br /> April 2, 2019 <br /> Climax Mine <br /> Attn: Ms. Diana Kelts <br /> Highway 91 <br /> Climax, CO 80429 <br /> RE: File M1977-493; Climax Mine; Adequacy Review for Technical Revision 29 (TR29)—Phase D <br /> Interceptor Improvement Project and Modifications to TR 19, 21 and 23 <br /> Ms. Kelts: <br /> The Division of Reclamation, Mining and Safety received Technical Revision 29—Phase D Interceptor <br /> Improvement Project and Modifications to TR 19, 21 and 23 on March 28, 2019. The decision date for <br /> this revision is currently set at April 29, 2019. <br /> DRMS has completed the initial adequacy review of TR29. DRMS has not identified any technical <br /> issues with the proposed work at this time. However, these proposed modifications will be conducted on <br /> facilities that are considered Environmental Protection Facilities (EPFs) by the Division. As such, <br /> DRNIS will require that the provided design drawings be signed and stamped by the Engineer of Record <br /> (EOR) for the facilities to be modified, as well as a commitment to submit similarly certified as-built <br /> reports upon completion. DRMS also will require notice when construction is to commence for the <br /> proposed work, so that in process inspections may take place. <br /> This concludes the Division's adequacy review of TR29. This letter shall not be construed to mean that <br /> there are no other issues in the submittal. Other issues may arise as additional information is supplied. If <br /> you have any questions, please contact me at (303) 866-3567 x8140. Please be advised that if you are <br /> unable to satisfactorily address any concerns identified in this review before the decision date, it will be <br /> your responsibility to request an extension of the review period. If there are outstanding issues that have <br /> not been adequately addressed prior to the end of the review period, and no extension has been <br /> requested, the Division must deny this revision. <br /> Sincerely, <br /> Eric Scott <br /> Environmental Protection Specialist <br /> 6F_�Ci1`� <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mimng.state.co.us <br /> Jared S. Polis, Governor ( Dan Gibbs, Executive Director Virginia Brannon, Director R <br />
The URL can be used to link to this page
Your browser does not support the video tag.