Laserfiche WebLink
Climax Molybdenum Climax Mine <br /> Highway 91 - Fremont Pass <br /> 0429 <br /> A Freeport-McMoRan Company Climax, )4 87718 <br /> p p y Phone (719)486-7718 <br /> Fax(719)486-2251 <br /> March 26, 2019 TR29 <br /> RECEIVED <br /> Mr. Eric Scott <br /> EC_ <br /> Environmental Protection Specialist MAR 2 0 2019 3 <br /> Division of Reclamation, Mining and Safety 3 <br /> Department of Natural Resources DMS"OF RECLAMATIpt4 °�' o <br /> 5 a � <br /> 1313 Sherman St. Room 215 H1 MMO&QJTY w <br /> Denver, Colorado 80203 0 <br /> w <br /> RE: Climax Mine, Permit No. M-1977-493,Technical Revision 29—Phase D Interceptor <br /> Improvement Project and Modifications to TR-19,21, and 23 <br /> Dear Mr. Scott, <br /> Enclosed please find Technical Revision 29 to the Climax Mine Reclamation Permit(M-77-493) <br /> that consists of the following: <br /> rn <br /> • Maintenance upgrades to portions of the West Interceptor(Phase D) and associated drawings I7�0 <br /> • Description of modification to TR-19, PDWTP Test Sludge Cell and associated drawing <br /> • Description of modification to TR-21, Mayflower Flood Bypass Tunnel and associated <br /> drawings <br /> • Description of modification to TR-23,replacement pages for the Operations and <br /> Maintenance Plan for the Mayflower Tailings Storage Facility and 5 Dam, and associated <br /> drawing <br /> The TR materials (hard copy and electronic files) and the $1,006.00 fee applicable to a 112d <br /> operation are attached to this letter. We appreciate your review of the TR and look forward to your <br /> approval. Please contact Raymond Lazuk at 719-486-7584 or me at 719-486-7525 if you need <br /> additional information. <br /> Sincerely, <br /> 7 ( �' � <br /> Diana Kelts <br /> Chief Environmental Scientist <br /> attachments <br />