My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-21_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-03-21_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:07:04 PM
Creation date
3/21/2019 4:15:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
3/21/2019
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR112
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONT RECEIVED <br /> Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mining Company <br /> MAR Z 1 Z019 100 <br /> 0.Box Sg, <br /> Victor, Co 80860 <br /> MW%OF RECLAnON www.newmont.com <br /> TR112. UMNG AND SAFELY <br /> 30 3 <br /> TC1� 3 <br /> SENT CERTIFIED RETURN RECEIPT REQUESTED ° c O <br /> 7017 2400 0000 4077 9446 <br /> w <br /> 0 <br /> March 19, 2019 <br /> Mr.Timothy Cazier,P.E. <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources <br /> Division of Reclamation,Mining and Safety o� <br /> Office of Mined Land Reclamation n m I-q <br /> 1313 Sherman Street,Room 215 j ,► <br /> Denver Colorado 80203 <br /> Re: Permit No. M-1980-244; Cripple Creek & Victor Gold Mining Company; Cresson Project; <br /> TR#112-Power Pole Installation <br /> Dear Mr. Cazier: <br /> Newmont Mining Corporation - Cripple Creek and Victor Gold Mining Company (CC&V) hereby <br /> provides the Division of Reclamation, Mining and Safety (DRMS) Technical Revision (TR) No.112 <br /> proposing the install of four power poles to provide fiber optic capabilities to ensure more reliable <br /> communications on site. <br /> BackEround• <br /> CC&V proposes this installation to provide network access to more locations on site to allow for better <br /> communication and improved safety. Figure 1 details the planned location for the power poles and line, <br /> located on the west side of highway 67 near the Absorption Desorption and Recovery(ADR)2 Plant. <br /> Modifications to the Approved Mine Plan: <br /> CC&V proposes to install the four power poles to extend the fiber optic line from the existing <br /> CenturyLink owned power poles located on Shelf Road, across Highway 67; connecting again to existing <br /> infrastructure at the ADR 2 Plant. <br /> Other Permits and Licenses: <br /> No other permits or licenses are required to construct the proposed modifications. A No Impact TR will <br /> be filed with Teller County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.