My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-01_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-02-01_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 10:55:32 AM
Creation date
2/1/2019 2:22:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
2/1/2019
Doc Name
Request for Technical Revision
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Type & Sequence
TR111
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONT tie+wont Muting Corporation <br /> Cripple Duel,&Viotoi Go!3 MinIop <br /> Cornpary <br /> 100 N3'St <br /> PO Bo,,191 <br /> Victor. CO 80860 <br /> vo w nem.oni corn <br /> January 29, 2019 <br /> SENT CERTIFIED RETURN RECEIPT REQUESTED <br /> 7018 0680 0000 4627 6474 <br /> Mr. Timothy Cazier, P.E. RECEIVED <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources FEB 012019 <br /> Division of Reclamation, Mining and Safety <br /> Office of Mined Land Reclamation DIVISION OF RECLAMATION <br /> 1313 Sherman Street, Room 215 MINING AND SAFETY <br /> Denver, Colorado 80203 <br /> Re: Permit No. M-1980-244; Cripple Creek & Victor Gold Mining Company; Cresson <br /> Project; TR 111 —Cement Substitution on Valley Leach Facilities <br /> Dear Mr. Cazier: <br /> Newmont Mining Corporation - Cripple Creek and Victor Gold Mining Company (CC&V) <br /> hereby provides the Division of Reclamation, Mining and Safety (Division) Technical Revision <br /> (TR)No.111 requesting to utilize cement at the Valley Leach Facilities (VLFs) as a pH modifier. <br /> Background: <br /> CC&V is proposing this modification in order to reduce operating costs and utilize the long-term <br /> pH-buffering influence of cement. Existing lime addition infrastructure and distribution methods <br /> will be used for cement addition. Currently, lime addition is controlled via a screw feeder onto <br /> the crushed ore conveyor at an average rate of 10-13 pounds per ton of ore; which is set in the <br /> crusher control system. Lime is then mixed throughout the ore stream via transfer chutes on the <br /> load-out bin conveyors. Crushed ore is then placed into haul trucks for placement on the VLFs. <br /> Attachment 1 details this process. Pending DRMS approval, the method for cement application <br /> will be identical to the current lime addition process. If the economics or supply of cement <br /> require, lime will be applied as a buffering agent as previously approved. <br /> Although lime and cement are chemically similar and possess comparable alkaline buffering <br /> capacities, the minor difference in the composition of the cement will allow for a longer-term <br />
The URL can be used to link to this page
Your browser does not support the video tag.