Laserfiche WebLink
s,; »O COLORADO DIVISION OF RECLAMATION, MINING A376 Y <br /> ,, 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 � <br /> �O <br /> Ogg <br /> REQUEST FOR TECHNICAL REVISION TR COVER SHE qr <br /> File No.: M- M-1998-003 Site Name:Raftopoulos Pit <br /> i <br /> County Moffat TR# DRMS Use onix) <br /> Permittee:3B Enterprises,llc <br /> Operator(If Other than Permittee):same <br /> Permittee Representative:Steve Baker <br /> Please provide a brief description of the proposed revision: <br /> Weed management to be implemented by Outlaw Enviromental and implemented in the <br /> spring of 2019. <br /> As defined by the Minerals Rules,a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition_ If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 11 Oc, 111, 112 construction <br /> materials,and 112 quarries $216 <br /> 112 hard rock (not DMO) $175 <br /> I IOd, 112d(1, 2 or 3) $1006 <br /> I <br />