My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-09_REVISION - M1984041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984041
>
2018-01-09_REVISION - M1984041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 3:07:16 PM
Creation date
1/9/2019 4:27:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984041
IBM Index Class Name
Revision
Doc Date
1/9/2018
Doc Name
Bond Calculations
From
DRMS
To
American Gypsum
Type & Sequence
TR11
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: <br />Site: Eagle -Gypsum Mine Permit Action: TRI l <br />PROJECT IDENTIFICATION <br />Task #: TRI 1 State: Colorado _ <br />Date: 1/9/2019 County: Eagle <br />User: SJM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: M1984041 <br />Abbreviation: None <br />Filename: M041-TRII <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />006 <br />Regrade 3:1 GRADER <br />2 <br />1 <br />2 <br />1 <br />1 <br />1.92 <br />$681.00 <br />$243.22 <br />$2,574.00 <br />$9,058.00 <br />$3,955.00 <br />remove culvert and rip rap DEMOLISH <br />0.00 <br />Spread topsoil over disturbed area DOZER <br />5.20 <br />Reve etate disturbed areas REVEGE <br />160.00 <br />Mobilize reclamation crew and equipment MOBILIZE <br />3.00 <br />SUBTOTALS: <br />170.12 <br />$16,511 <br />INDIIMECT COSTS <br />$0.00 <br />OVERHEAD AND PROFIT: <br />$0.00 <br />Liability insurance: <br />0.00 <br />Performance bond: <br />0.00 <br />Job superintendent: <br />0.00 <br />Profit: <br />10.00 <br />Total = <br />$0.00 <br />Total = <br />$0.00 <br />Total = <br />$0.00 <br />Total= <br />$1,651.10 <br />TOTAL O & P = <br />$1,651.10 <br />CONTRACT AMOUNT (direct + O & P) = <br />$18,162.10 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />0.00 <br />Total = $0.00 <br />Reclamation management and/or administration: <br />0.00 <br />$0.00 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST= $1,651.10 <br />TOTAL BOND AMOUNT (direct + indirect) = $18,162.10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.