My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-26_REVISION - M2016081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2018-10-26_REVISION - M2016081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 3:21:25 AM
Creation date
10/29/2018 1:46:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
REVISION
Doc Date
10/26/2018
Doc Name
Adequacy Review
From
AuPt Industries
To
DRMS
Type & Sequence
TR1
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AuPt Industries LLC <br /> Peter Freedman <br /> PO Box 1424 <br /> Edwards, Co 81632 <br /> RECEIVED <br /> Colorado Division of Reclamation,Mining and Safety OCT 2 6 2018 <br /> 1313 Sherman Street, Room 215 DIVISION OF RECLAMATION <br /> Denver, CO 80203 MINING AND SAFETY <br /> October 23, 2018 <br /> RE: West Side Placer, File No. M-2016-081 ,Technical Revision (TR-1) Adequacy Review <br /> Amy Yeldell, <br /> The following documents to address Preliminary Adequacy Issues for TR-01 Adequacy Request Responses <br /> Attached documents include. <br /> 1) Updated Mining Plan <br /> 2)Mining Plan Map <br /> 3) Reclamation Plan <br /> 4) Reclamation Plan Map <br /> 5)Architectural plans for the rapid thickener and thickener base plans. <br /> 6)MSDS for Flocculant used. <br /> In response to questions from Colorado Division of Reclamation, Mining and Saftey Technical Revision (TR-1) <br /> Adequacy Review: <br /> 1. Please provide an updated Mining Plan and Mining Plan Map,fully describing any changes proposed <br /> through TR-01, and addressing the applicable requirements of Rules 6.3.3 and 6.3.5(2), as follows: <br /> a. Pursuant to Rule 6.3.3(1)(e), describe the rapid thickener and explain its function. Provide detailed <br /> descriptions and drawings of the physical structure and foundation for the structure. Locate and label the <br /> rapid thickener and all associated structures on the updated Mine Plan Map. <br /> The rapid thickener is a tank with a rotating rake that is designed to remove sediment,primarily clays and sub 200 mesh par- <br /> ticles from process water so that water can be recycled for continual process water use.See attached architectural diagrams <br /> and photos provided.Updated Mine Plan and Map reflect these changes. <br /> AuPt Industries LLC 1970 306 1784 1 P.O.Box 1424-Edwards,CO 81632 <br />
The URL can be used to link to this page
Your browser does not support the video tag.