Laserfiche WebLink
TABLES <br /> Table 2.03-1 Affected Areas for Mining and Reclamation <br /> Life of Mine to Date 1976—2011 3,602 1,619 <br /> Current Permit Term 2017—2021 (Estimated) 0 284 <br /> Projected Life of Mine 202](Estimated)2 0 1,365 <br /> Total(Life of Mine) 3,602 3,268 <br /> Phase III release acreages through February of 2017 have been removed for the total disturbance acres. <br /> 2480 acres of the total acres are long-term mining and/or facilities. <br /> Tables 1 Revision Date: 4/7/17 <br /> Revision No.: RN-07 <br />