Laserfiche WebLink
Daily Report ■ <br /> VLF2 Geomembrane Recertification <br /> 475.0106.026 ■ <br /> July 5,2018 <br /> 2.0 COMANCO ACTIVITIES <br /> 2.1 Geomembrane Acceptance <br /> No activities during the shift <br /> 2.2 Geomembrane Installation <br /> No activities during the shift <br /> 3.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed DCF placement, DCF removal, and anchor trench excavation <br /> during the shift. <br /> 4.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> If you have any questions or require additional information, please contact us at your <br /> convenience. <br /> Sincerely, <br /> NewFields Mining Design &Technical Services <br /> Prepared by: Benjamin Melly. 817.889.7315 <br />