My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-04_REVISION - C1980007 (9)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2018-09-04_REVISION - C1980007 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 11:18:05 AM
Creation date
9/4/2018 11:16:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
9/4/2018
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Mountain Coal Company, LLC
Type & Sequence
PR15
Email Name
lds
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor | Robert W. Randall, Executive Director | Virginia Brannon, Director <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br /> <br />September 4, 2018 <br /> <br /> <br />Kathleen G. Welt <br />Mountain Coal Company, LLC <br />5174 Highway 133 <br />Somerset, CO 81434 <br /> <br /> <br />Re: West Elk Mine (Permit No. C-1980-007) <br /> Proposed Decision <br /> Permit Revision Application No. 15 (PR-15) <br /> <br /> <br />Dear Ms. Welt: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision <br />Package for Permit Revision No. 15 at the West Elk Mine. Notice of the proposed decision will be <br />published in the Delta County Independent as soon as possible. The first publication will initiate <br />the thirty (30) day public comment period for the Division's decision. <br /> <br />Documentation must be submitted to the Division demonstrating that a copy of the approved <br />revision application was sent to the Office of Surface Mining and the Bureau of Land <br />Management. The material should be sent within 15 days of final approval. <br /> <br />Please be advised that federal mine plan approval may need to be obtained from the Office of <br />Surface Mining Reclamation and Enforcement (OSM). OSM approval, in addition to State permit <br />approval, is required, before operations affecting federal coal may commence. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the <br />amount of Bond Held equals or exceeds the Revised Liability, you need not submit additional <br />bond. However, if the Revised Liability exceeds the Bond Held, please submit additional bond or <br />rider to your existing bond that equals or exceeds the Revised Liability. This Permit Revision must <br />not be implemented until this proposed decision becomes final and until any required increase in <br />bond is submitted to and approved by the Division. <br />
The URL can be used to link to this page
Your browser does not support the video tag.